TRANSPORTATION DEPT
Collins Engineers, Inc.
210562
FY22 Enhanced Pier Caps
1049839
This contract was for enhanced, arms reach, inspections of pier caps throughout Metro District, to determine baseline conditions for future monitoring and potential analysis of pier caps for strengthening needs in the future. As Metro District has over 1500 bridges, and over 700 due for routine inspections each year, we do not have the required manpower to also
perform these enhanced inspections in a timely manner, and as such require a consultant contract to assist in completing
these inspections.
Project Duration
Thu, 04/14/2022 - 00:00
Tue, 02/28/2023 - 00:00
Thu, 06/30/2022 - 00:00
Yes
{Empty}
Contract Amounts
$99956.77
{Empty}
$99956.77
Yes
TH
No
{Empty}
Arseneau,Michael Bernard
Michael.Arseneau@state.mn.us
All work and deliverables were completed on time and on schedule.
Data collected and reported regarding shear cracks was very thorough, detailed, and easy to understand for future evaluation
Cost was as expected, considering the additional work on their end, compared to previous contracts given to Collins
good
Yes
{Empty}
5 - very satisfied