Submission Number: 24341
Submission ID: 74805
Submission UUID: 44f36c5a-0584-4579-8127-b1bbfea02357

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:47

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Pollution Control Agency
Braun
211019
SW-58 groundwater delineation FY22
{Empty}
Braun Intertec is going to perform a subsurface investigation at the Hopkins Closed Landfill to delineate the extent of groundwater contamination. Braun will install five nested monitoring well pairs (10 wells) set in the unconsolidated aquifer. Braun will prepare drilling specifications and oversee drilling activities. New wells will be developed. A round of groundwater sampling will be conducted at new and existing wells. Braun will prepare a report summarizing methods and results.
Project Duration
Tue, 04/26/2022 - 00:00
Thu, 06/30/2022 - 00:00
Thu, 06/30/2022 - 00:00
Yes
{Empty}
Contract Amounts
$70300.97
{Empty}
$67141.45
Yes
STATE
No
{Empty}
Kevin Mustonen
Kevin.Mustonen@STATE.MN.US
Very satisfied
Very satisfied
Very satisfied
Very satisfied
Yes
{Empty}
5 - very satisfied