Submission Number: 24327
Submission ID: 74791
Submission UUID: f77b2133-2329-4ce2-9bff-2e487d956b81

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:47

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Pollution Control Agency
Braun Intertec
211619
SW-25_groundwater delineation_FY22
{Empty}
Braun Intertec will perform a subsurface investigation at the Winona County Closed Landfill to delineate the extent of groundwater contamination. Braun will prepare drilling specifications and will subcontract the drilling to a state contractor. Braun will oversee drilling activities. Drilling activities will include borehole logging and the installation of three groundwater monitoring wells. Braun will prepare a report summarizing methods and results. Braun will perform all services and/or construction as per the purchasing manual.
Project Duration
Tue, 05/10/2022 - 00:00
Thu, 06/30/2022 - 00:00
Thu, 06/30/2022 - 00:00
Yes
{Empty}
Contract Amounts
$122025.71
{Empty}
$420.81
Yes
State
No
{Empty}
Kevin Mustonen
Kevin.mustonen@state.mn.us
5 Very Satisfied
5 Very Satisfied
5 Very Satisfied
5 Very Satisfied
Yes
none
5 - very satisfied