Submission Number: 23963
Submission ID: 74427
Submission UUID: 947ae75a-adfa-405d-85cf-737ef8d3f741

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:47

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Pollution Control Agency
AECOM
201384
Beta Site Well Drilling
{Empty}
AECOM will oversee the installation of bedrock observation wells (via rotosonic drilling methods) at the location selected to be the next priority for the future completion of an aquifer pumping test along the Project 1007 conveyance system (BS20). The location of the proposed observation well installation is within the Lake Elmo Park Reserve (LEPR). Additionally, a nested pair of wells (one each completed in the Jordan and Shakopee Aquifers) at Beta Site 10 and one Jordan Aquifer well will be installed at Beta Site 18
Project Duration
Wed, 09/29/2021 - 00:00
Thu, 06/30/2022 - 00:00
Thu, 06/30/2022 - 00:00
Yes
{Empty}
Contract Amounts
$372329.90
{Empty}
$372329.90
Yes
State
No
{Empty}
Tim Lockrem
Timothy.lockrem@state.mn.us
Very satisfied
Very satisfied
Satisfied
Very satisfied
Yes
None
5 - very satisfied