Corrections Dept
Karges Faulcinbridge , Inc
151210
Design for Restore of Hillcrest Tunnel
78FA0068
Repair structural and electrical components recommended actions of the Hillcrest section of tunnel as described by the MCF-FRB Faribault Tunnel Study Update, dated 4/26/18, (Reference: KFI project # 18-063.00, RECS project #78FA0062) Recommended Actions: „X Repair delaminated concrete below Power Plant. „X Full replacement of tunnel lid outside of Power Plant. „X Replace tunnel lid at offshoot tunnel to well house. „X Patch spalled concrete as required. „X Close off tunnel beyond water main. Infill tunnel with soil or concrete. „X Waterproof Tunnel.
Project Duration
Wed, 01/09/2019 - 00:00
Tue, 06/30/2020 - 00:00
Tue, 07/30/2019 - 00:00
Yes
{Empty}
Contract Amounts
$59800.00
{Empty}
$36684.00
Yes
AP
No
{Empty}
Bee Yang
bee.yang@state.mn.us
The contractor¡¦s timeliness was satisfactory. However project was cancelled prior to bidding and construction phase.
The contractor¡¦s quality of work was satisfactory.
The contractor¡¦s cost was satisfactory.
The contractor¡¦s overall performance was satisfactory.
Yes
{Empty}
3 - neutral