TRANSPORTATION DEPT
WSB & Associates, Inc.
191418
Bridge 27831 Deck Inspection
1045260
The purpose of this contract was to perform a thorough deck inspection of the Dunwoody Bridge (Bridge #27831) and other nearby bridges to provide the District with accurate data about its condition which in its turn will help the District minimize risk while scoping and developing a cost effective repair work for an anticipated bridge preservation project in Fiscal Year
2026.
It was necessary to enter into a contract because a thorough deck inspection utilizes advanced Non-Destructive Evaluation
methods which are needed by MnDOT on occasional basis. Therefore, it was not economically feasible for the agency to
purchase and own such equipment, and train MnDOT personnel on operating it especially when the bridge crews have other
work that needs to be prioritized. In-addition, some of these methods take a lot of post processing expertise
Project Duration
Mon, 03/29/2021 - 00:00
Thu, 06/30/2022 - 00:00
Thu, 09/30/2021 - 00:00
No
{Empty}
Contract Amounts
$201916.92
{Empty}
$201916.92
Yes
th
No
{Empty}
Fawaz,Mohamad
Mohamad.Fawaz@state.mn.us
The contractor addressed project issues and needs in a timely manner. A drone crash incident (Sub) resulted in a delayed submittal of some contract items.
The quality of the performed inspection and submittal documents exceeded the contract requirements and expectations.
The contractor's cost was within MnDOT's allocated budget and exceeded expectations.
good
Yes
{Empty}
5 - very satisfied