TRANSPORTATION DEPT
Bolton & Menk, Inc.
175278
TH 210 Baxter Access Study
1036771
The purpose of this study was intended to provide a sufficient level of traffic operation analysis to identify traffic conditions
and design feasibility assessment to assist the State in identifying preferred access and safety improvement concepts for the
TH 210 in Baxter.
Project Duration
Thu, 04/16/2020 - 00:00
Sat, 07/31/2021 - 00:00
Fri, 07/30/2021 - 00:00
Yes
{Empty}
Contract Amounts
$99361.73
{Empty}
$99361.73
Yes
th
No
{Empty}
Voss,Steven J
Steve.Voss@state.mn.us
Contractor stayed on schedule and provided time in schedule to respond to changing conditions and issues
Meeting presentations, materials, and final study report were prepared in a professional manner.
Consultant managed the financial resources allocated for this project in an effective manner. Final study report provides good
value to the District. The study recommendations can be readily implemented. by the District and other stakeholders.
good
Yes
{Empty}
5 - very satisfied