Pollution Control Agency
AECOM
191886
Project 1007 Shallow Well Installation
{Empty}
AECOM will oversee the installation of shallow monitoring wells at eight locations selected to be highest priority along the Project 1007 conveyance system. These wells will range in depth from 40 feet to 140 feet. The majority of the wells will be completed in Quaternary sediments above bedrock, but three wells are expected to be completed either within the St. Peter or Platteville bedrock formations.

AECOM will also conduct expanded surface water / groundwater model domain support. This includes:
Identifying additional Beta Site locations for Bedrock well installation.
Developing a surface water and sediment sampling plan.
Initiating access to potential properties where investigation is likely to happen.
Integrating the expanded model domain to include all the work completed to date along the Project 1007 assessment area.
Project Duration
Thu, 04/15/2021 - 00:00
Wed, 06/30/2021 - 00:00
Wed, 06/30/2021 - 00:00
Yes
{Empty}
Contract Amounts
$212352.50
{Empty}
$212352.50
Yes
State
No
{Empty}
Tim Lockrem
timothy.lockrem@state.mn.us
Very Satisfied
Very Satisfied
Satisfied
Satisfied
Yes
{Empty}
5 - very satisfied