Submission Number: 22832
Submission ID: 73296
Submission UUID: ef62bb76-d9b2-4b18-910a-1e44c548fa41

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:43

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Pollution Control Agency
AECOM
189083
Project 1007 Evaluation-2nd Half FY21
{Empty}
AECOM will continue to provide assessment and evaluation services for Project 1007 to the MPCA. The FY21 proposed subsurface work includes:

Soil Delineation at Ideal Avenue Wetland Complex (IAWC). This includes advancing approximately 40 soil borings over a 3.15 acre parcel and collecting up to 160 sediment samples for analytical testing.

Seasonal Surface Water/Sediment/Groundwater Sampling. This includes the collection of 80 surface water samples, 10 sediment samples, and performing two rounds of quarterly groundwater sampling for the existing bedrock monitoring well, shallow well, and piezometer network (a total of 120 groundwater samples).

Groundwater/Surface Water Model Work Plan/Conceptual Site Model (CSM) Development. AECOM will use existing available modeling data to aid in developing quantitative modeling tools on a sub-regional scale to assist in the evaluation of Project 1007. AECOM will also continue to develop intuitive visualization tools that will aid in developing a comprehensive three-dimensional CSM.
Project Duration
Mon, 02/15/2021 - 00:00
Wed, 06/30/2021 - 00:00
Wed, 06/30/2021 - 00:00
Yes
{Empty}
Contract Amounts
$472527.14
{Empty}
$472527.14
Yes
State
No
{Empty}
Tim Lockrem
timothy.lockrem@state.mn.us
Very Satisfied
Very Satisfied
Satisfied
Very Satisfied
Yes
{Empty}
5 - very satisfied