TRANSPORTATION DEPT
Parsons Transportation Group, Inc.
167152
Preliminary and Final Design, Bridge 11011 and App
1027412W02
A combined bridge and grading plan-set was needed to deliver a complex bridge replacement connected to the Pine river Dam,
Stability and constructability issues required specialty geotechnical, structural and hydrologic engineering to bring this
project to letting.
Project Duration
Fri, 09/27/2019 - 00:00
Sun, 10/31/2021 - 00:00
Fri, 07/09/2021 - 00:00
Yes
{Empty}
Contract Amounts
$997925.55
$83107.43
$1081032.98
No
th
No
{Empty}
Schiller,Eric J
Eric.Schiller@state.mn.us
Met objective schedule to letting.
Met objective
Higher than average
good
Yes
{Empty}
4 - satisfied