Submission Number: 22632
Submission ID: 73096
Submission UUID: c2168d1e-7c6c-4e9c-a744-abe91620ff01

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:43

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Erickson Engineering Company, LLC
185422
Enhanced Bridge Inspections within the Metro Distr
1044640
Many Metro District bridges have exhibited structural shear cracking in reinforced concrete pier caps. These cracks must be inspected at an arms reach to determine dimensions for further analysis of capacity.
Metro District bridge inspection staff has a significant number of routine safety inspections to complete each year within
statutory FHWA timelines and does not have the necessary manpower to perform additional enhanced inspections without
significantly sacrificing inspection quality or failing to meet FHWA deadlines.
Project Duration
Fri, 11/06/2020 - 00:00
Wed, 06/30/2021 - 00:00
Wed, 06/30/2021 - 00:00
Yes
{Empty}
Contract Amounts
$99328.10
{Empty}
$99328.10
Yes
th
No
{Empty}
Arseneau,Michael Bernard
Michael.Arseneau@state.mn.us
All inspections and reports were completed by the June 30th deadline.
All inspections and reports had a high level of quality and were completed to the level required of for MnDOT inspections.
Contract was completed below budget.
good
Yes
{Empty}
4 - satisfied