TRANSPORTATION DEPT
SRF Consulting Group, Inc
176809
Provide right of way surveying for right of way ma
1036185
Work load with multiple projects being let at the same time had lack of MnDOT technical staff to do mapping
Project Duration
Fri, 05/15/2020 - 00:00
Sat, 01/15/2022 - 00:00
Wed, 03/31/2021 - 00:00
No
{Empty}
Contract Amounts
$80270.98
{Empty}
$80270.98
No
th
No
{Empty}
Nielsen,Lynn M
Lynn.Nielsen@state.mn.us
Mapping wasn't completed by the time the contract budget ran out.
It was a learning experience for the contractor to deliver RW mapping. Required a lot of training on DOT's part to get to the
product required.
Contractor had a ES/Associate engineer do the mapping at a high cost and more hours than expected for what would be TGS work
if the State did the same mapping.
good
Yes
{Empty}
3 - neutral