TRANSPORTATION DEPT
Saint Cloud Area Planning Organization
175282
Trunk Highway 15 Operations Improvement Study
1036662
Corridor is important to the St. Cloud metro area's transportation system. It is high volume corridor with identified safety issues.
The study was needed to conduct further analysis of the corridor and develop a set of solutions that are affordable to
implement based on future revenues. As a regional corridor, it was important to involve the affected jurisdictions and the public
in the process. The St. Cloud APO as the designated MPO for the area was the appropriate entity to lead this consultant assisted
planning effort.
Project Duration
Wed, 04/15/2020 - 00:00
Wed, 06/30/2021 - 00:00
Sat, 12/12/2020 - 00:00
Yes
{Empty}
Contract Amounts
$249920.77
{Empty}
$249920.77
Yes
th
No
{Empty}
Voss,Steven J
Steve.Voss@state.mn.us
Project deliverables were completed in a timely manner.
Project deliverables were completed in a professional manner
Consultant shifted some time from macro-level analysis to micro-level options as study dictated the need to do so.
good
Yes
{Empty}
5 - very satisfied