TRANSPORTATION DEPT
BWBR Architects, Inc.
146164
Rochester District Headquarters Lower Level Remode
1031698
The contract was required to complete the design and construction administration for the addition and remodeling of the MnDOT District 6 Headquarters building in Rochester.
Project Duration
Fri, 08/17/2018 - 00:00
Sat, 08/01/2020 - 00:00
Tue, 12/31/2019 - 00:00
Yes
{Empty}
Contract Amounts
$64375.00
{Empty}
$64375.00
Yes
th
Yes
Contractor was selected by the State Designer Selection Board in 2008. Services provided by the Contractor occurred in multiple phases, and required three separate contracts due to five-year consultant contract limits (this is the third). This contract was required in order to complete the final phases of the overall multiyear project.
Jones,David Rhys
David.R.Jones@state.mn.us
acceptable
good to very good
reasonable
good
Yes
{Empty}
3 - neutral