Corrections Dept
Cundy Santine & Assoc.
133590
Design for Upgrade G2 Bldg Mech & Elec.
78LL0033
The project required professional architectural and M&E design for the upgrade of MCF - Lino Lakes G Buildings end of life HVAC system.
Project Duration
Thu, 10/26/2017 - 00:00
Sat, 10/26/2019 - 00:00
Sun, 10/18/2020 - 00:00
No
{Empty}
Contract Amounts
$71800
$7370
$79170
Yes
AP
No
{Empty}
Bee Yang
bee.yang@state.mn.us
The contractor's timeliness was satisfactory. The project took longer than anticipated due to unforeseen conditions and availability of funds.
The initial project was fairly straight forward with the replacement of HVAC. During design, hazardous material was discover that required additional design consideration and phasing of construction phase. The consultant guided the project through all phases in delivering a successful project.
The contractor's cost was satisfactory.
The contractor's timeliness was satisfactory.
Yes
{Empty}
4 - satisfied