TRANSPORTATION DEPT
Short Elliott Hendrickson, Inc.
103367
STILLWATER LIFT BRIDGE CONVERSION PS&E
1000125W04
The contract was needed to provide preliminary and final design to convert the Stillwater Lift Bridge from a traffic bridge to a pedestrian bridge and bring back the historic colors of the original bridge. The bridge is a truss bridge and requires a high level of design knowledge and expertise
Project Duration
Wed, 11/18/2015 - 00:00
Sun, 06/30/2019 - 00:00
Tue, 06/30/2020 - 00:00
Yes
{Empty}
Contract Amounts
$220947.01
$255389.93
$476336.94
Yes
TH
No
{Empty}
Rustad,Eric Lemuel
Eric.Rustad@state.mn.us
SEH was very timely in delivering the final design plan for MnDOT construction to administrate.
SEH had a high quality plan and proposal.
The costs were responsible for an historic bridge that is over 80 years old.
GOOD
Yes
{Empty}
4 - satisfied