Pollution Control Agency
Braun Intertec Corporation
170057
Pine Street Dump
{Empty}
Braun will oversee the installation of temporary monitoring wells and conduct groundwater sampling for PFAS, 1,2-Dioxane, and VOCs, Sub-slab soil vapor sample for VOCs, and remove sub-slab soil gas sample points.
Braun will prepare a letter report summarizing sampling activities and data results.
Braun will Prepare vapor sampling property summary reports (PSRs).
Project Duration
Mon, 12/09/2019 - 00:00
Tue, 06/30/2020 - 00:00
Tue, 06/30/2020 - 00:00
Yes
{Empty}
Contract Amounts
$61490.63
{Empty}
$52755.82
Yes
State
No
{Empty}
Allan Timm
Allan.timm@state.mn.us
Very satisfied. Braun did a great job of getting the project completed with all the uncertainties due to COVID this spring.
Very satisfied. A large part of the work involved PFAS sampling under the State Contractor. I think that this was the first state PFAS project for them and it all went well. Issues unique to PFAS were resolved before they went out into the field. They also did a great job of coordinating with the labs. We were asked to use (ALS) for the PFAS part and we used Pace for the rest of the analytical. So they had to coordinate with multiple labs. It was one of the first PFAS projects where the state used ALS.
Very satisfied.
Very satisfied.
Yes
{Empty}
5 - very satisfied