Corrections Dept
Paulson & Clark Engineering, Inc.
119806
Study to Replace Generator Controls
{Empty}
Contract was for the design and construction administration to replace the switchgear at MCF-Moose Lake. Switchgear is supposed to transfer power to back up generators when an outage occurs, but had failed to do so recently.
Project Duration
Thu, 01/12/2017 - 00:00
Sat, 01/12/2019 - 00:00
Sat, 09/30/2017 - 00:00
Yes
{Empty}
Contract Amounts
$9000
$10500
$19500
Yes
CAPRA/Agency
No
{Empty}
Ben Kitograd
benjamin.kitograd@state.mn.us
Consultant was timely with completing their work
Quality of the work was OK. There were several times that it felt like the consultant wasn't double checking their own work.
Costs were fair
Overall performance was less than OK. There were several meetings missed by the consultant, and as mentioned above there were several times where it felt like they weren't double checking their own drawings before finalizing them. This was however an emergency project, which was known by the consultant. It was also requested by the facility that extra attention be paid to this project do to the nature of the work and its location (a correctional facility) Consultant did not follow through on this request.
No
N/A
2 - dissatisfied