TRANSPORTATION DEPT
Alliant Engineering Inc
86575
Traffic Study and Final Design Plan Sheets, TH169
7090
To provide a study of the potential detour routes and develop a final design planset and supporting documentation.
Project Duration
Thu, 12/04/2014 - 00:00
Fri, 11/25/2016 - 00:00
Sat, 05/09/2015 - 00:00
Yes
{Empty}
Contract Amounts
$99634.84
$0.0
$99634.84
Yes
Trunk Highway
No
XXXXX
Peter Harff
peter.harff@state.mn.us
Very Good
Very Good
Exceptional
Very Good. Worked closely together, Adjusted to changes in design.
Yes
None
5 - very satisfied