Agriculture Dept
Terracon
115212
Former Mallard Ridge PCP Site
PVM257092
Oversight of monitoring well sealing; preparation and filing of a deed affidavit for the site property on which residual agricultural chemical contamination remains in soil and groundwater. These actions were necessary to close the site with a contingency area for the residual soil and groundwater contamination.
Project Duration
Thu, 10/13/2016 - 00:00
Fri, 06/30/2017 - 00:00
Fri, 06/30/2017 - 00:00
Yes
{Empty}
Contract Amounts
$6697.90
{Empty}
$6697.90
Yes
2018-B04311R9-B041A15
Yes
This site was in groundwater monitoring stage. Terracon had extensive knowledge of the project from prior Fiscal Years' work (FY15 and FY16), which resulted in more efficient and cost-effective work completion during FY17.
Michele Mabry
michele.mabry@state.mn.us
Terracon was very timely in completing the scope of work during FY17. No issues.
Terracon's quality of work performed was adequate.
Terracon's cost was acceptable for the scope of work completed.
Terracon did a good job performing the scope of work, and communicating with MDA when questions arose.
Yes
None.
4 - satisfied