TRANSPORTATION DEPT
HZ United, LLC
65730
CAYUGA BRIDGE CONSTRUCTION RE-DESIGN DRAINAGE STRU
4150
To provide re-designs as needed to address unforeseen conditions on a construction project that would not allow the original
design to work
Project Duration
Fri, 07/19/2013 - 00:00
Mon, 11/30/2015 - 00:00
Wed, 11/30/2016 - 00:00
Yes
{Empty}
Contract Amounts
$98311.68
$153740.00
$252051.68
Yes
TH
No
{Empty}
Kordosky,Steven R
Steve.Kordosky@state.mn.us
Good delivery with difficult constraints. I though the bridge drainage design took too long
The revised Plans were good
Hugh did a great job at keeping costs down
Very Satisfied
Yes
{Empty}
5 - very satisfied