TRANSPORTATION DEPT
CH2M Hill, Inc
14368
EIS FOR REALIGNMENT OF TH 53 BETWEEN EVELETH AND V
97011
The contract was for an EIS for the relocation of T.H. 53 through a mine. District does not have staff for an EIS and there were
many issues (i.e. Air Quality, noise, water quality) that the department does not have expertise in
Project Duration
Mon, 12/13/2010 - 00:00
Thu, 07/31/2014 - 00:00
Fri, 02/27/2015 - 00:00
Yes
{Empty}
Contract Amounts
$1008958.38
$1001674.76
$2010633.14
Yes
TH/BOND
No
{Empty}
Dwyer,Roberta P
Roberta.Dwyer@state.mn.us
CH2 could not meet any of the schedules set and then jointly revised. KH met the schedule set.
CH2 did not produce anything that could be used. KH produced an excellent document.
CH2 was very costly. Kimley Horn was very cost efficient
Very Dissatisfied
No
{Empty}
1 - very dissatisfied