Submission Number: 16944
Submission ID: 67408
Submission UUID: 211ae53e-7f8c-45fa-b95e-5dbf4637e046

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:58

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Braun Intertec Corporation
87141
Soil Borings for I-35W Reconstruction Project
6562
Provide soil borings and analytical services for the reconstruction of I-35W between 42nd Street and I-94 in Minneapolis.

Metro Soils drill crews have a backlog of soils investigations to perform and were not able to drill all of the needed projects in a timely manner. In addition, this is a major project that required an intensive soils investigation under difficult traffic control conditions in order to make pavement recommendations to Metro Design.
Project Duration
Fri, 12/19/2014 - 00:00
Sun, 05/31/2015 - 00:00
Sun, 05/31/2015 - 00:00
Yes
{Empty}
Contract Amounts
$130490.00
$0.0
$130490.00
Yes
Trunk Highway
No
n/a
Tim Clyne, P.E.
tim.clyne@state.mn.us
The contractor completed his work and submitted his deliverables well within the time requirements.
The contractor’s work was of high quality. He was very careful and thorough in his work and in the information provided to MnDOT.
The contractor’s cost was reasonable.
The contractor did an excellent job planning out and executing the work. He kept me informed on progress on the project and communicated problems he encountered and how he intended to solve them.
Yes
None
5 - very satisfied