TRANSPORTATION DEPT
HNTB Corporation
17583
Hastings Bridge Design-Build Verification and Cons
96086
Provide design verification and construction oversight for the Hastings Bridge replacement.

This work could not be done in-house because the specialized expertise was not available. The sheer volume of work would have overwhelmed MnDOT and other state resources.
Project Duration
Tue, 07/13/2010 - 00:00
Fri, 10/31/2014 - 00:00
Thu, 05/28/2015 - 00:00
Yes
{Empty}
Contract Amounts
$4120323.76
$71415.98
$4191739.74
Yes
Bond
No
n/a
Steve Kordosky, P.E.
steve.kordosky@state.mn.us
Good
Above average
Stayed within budget
Good
Yes
None
5 - very satisfied