Submission Number: 16895
Submission ID: 67359
Submission UUID: 8a141fec-17b8-4a0f-b2f1-d66f6555ef7b

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:58

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Braun Intertec Corp.
83668
Fracture Energy Test Implementation 2014
6396
This contract was part of a larger project of which the objective is to develop and implement performance specifications to improve low-temperature cracking resistance of asphalt mixtures. The goal of this contract was to determine the precision and repeatability of the DCT test (asphalt fracture energy) between different labs, among other things.
Project Duration
Fri, 09/19/2014 - 00:00
Wed, 09/30/2015 - 00:00
Wed, 09/30/2015 - 00:00
Yes
{Empty}
Contract Amounts
$34932.00
$0.0
$33226.25
Yes
Trunk Highway
No
n/a
Dave Van Deusen
dave.vandeusen@state.mn.us
Timeliness of contractor’s results were satisfactory.
Very good.
Reasonable. The work stayed within budget.
Very good. Contractor performed the work as per the contract requirements, within budget, and on time.
Yes
None
5 - very satisfied