TRANSPORTATION DEPT
HDR Construction Control Corporation (HDR CCC)
67422
Construction and Bituminous Plant Inspection Servi
3681
Due to the volume of work for this construction season, the State needed assistance from a contractor to provide construction field inspection, materials sampling and testing, bituminous plant monitoring and project documentation services for construction of SP 8580-163 on Interstate 90 (I-90) and SP 8502-33 on Trunk Highway (TH) 43, respectively. The construction work tasks included bituminous mill and overlay, culvert repairs, guardrail repairs and other associated work. The Contractor completed the required services under the supervision of a registered professional engineer.
Project Duration
Thu, 08/15/2013 - 00:00
Fri, 08/14/2105 - 00:00
Tue, 12/15/2015 - 00:00
Yes
{Empty}
Contract Amounts
$99995.81
$14247.59
$114243.40
Yes
Trunk Highway Fund
Yes
The State single sourced the existing Contractor to complete additional work beyond the $100,000 contract limit for the original contract. The issue was timing. By the time it was determined that additional inspection work was necessary to complete the construction, there was no time to stop construction and advertise for a different contractor to provide the additional inspection.
Jeffrey Bunch
Jeffrey.bunch@state.mn.us
Good
Fair
Average
Average
Yes
None
4 - satisfied