Submission Number: 16832
Submission ID: 67296
Submission UUID: bf7b1520-f813-461d-ac5d-dc3333a7dfb7

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:58

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Alliant Engineering, Inc.
55115
SMART Signal Timing Optimization Demonstration
1023
This Contract was awarded as part of the Mn/DOT Innovative Idea Program. The intent of this program is to fund projects that are beyond the basic or applied research stage. Projects that can benefit from an operational test setting or demonstrate ongoing advances in technology are desired through this solicitation. Projects that demonstrate a higher potential for deployment are desired over simple demonstration projects.

The objective of this project was to utilize SMART signal technology to collect and analyze traffic data and develop performance based systems measures to determine when a signalized traffic corridor needed to be re-timed.
Project Duration
Fri, 11/09/2012 - 00:00
Sat, 01/31/2015 - 00:00
Tue, 06/30/2015 - 00:00
No
{Empty}
Contract Amounts
$398129.77
$0.0
$398129.77
Yes
State Funds
No
{Empty}
Steve Misgen
Steve.misgen@state.mn.us
Very good
Very good
Good
Very good
Yes
None
4 - satisfied