TRANSPORTATION DEPT
HDR Engineering, Inc.
76728
Preliminary and Final Bridge Design – Bridges 2797
04485 W05
To perform the preliminary and final design of Bridges 27973 and 27974 (27W21 and 27W22). To prepare final bridge plans for these same bridges.
Project Duration
Thu, 04/23/2015 - 00:00
Tue, 06/30/2015 - 00:00
Tue, 06/30/2015 - 00:00
Yes
{Empty}
Contract Amounts
$279724.83
$4271.67
$283996.50
Yes
TH
No
{Empty}
Benjamin Jilk
ben.jilk@state.mn.us
Satisfactory
Satisfactory
Satisfactory
The Contractor did a good job on this project. They got work done when needed and provided a quality product.
Yes
{Empty}
4 - satisfied