Submission Number: 16699
Submission ID: 67163
Submission UUID: 455c5c10-39a4-49d4-aa54-9a964d841fa9

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:58

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Bolton & Menk, Inc
67099
Design Hydraulics (District Wide)
4350
To performing final design/hydraulics work within District 7.
• Support Final Design Plan Preparation
• Support Hydraulic Permit Application and Documentation
• Support Hydraulic Pipe Analysis
• Provide the Checker, Corrector, and/or Verifier in the Quality Control Check Proecss as outline in the MnDOT Design-Bid-Build Quality Management Process. (http://www.dot.state.mn.us/design/qmp/documents/QMP-manual.pdf). This includes all necessary plans, measurement computations, design calculations, and or special provisions.
• Provide Life Cycle Cost Analysis (LCCA)
• Support Project Scoping Activities
• Attend, if applicable, public meetings
• Record and provide meeting notes
Project Duration
Tue, 08/13/2013 - 00:00
Wed, 07/01/2015 - 00:00
Tue, 06/30/2015 - 00:00
Yes
365.5
Contract Amounts
$100000.00
$0.00
$365.5
Yes
TH
No
{Empty}
Brett Benzkofer
brett.benzkofer@state.mn.us
Excellent
Very good
Well under budget
The Contractor was easy to work with and performed quality work very efficiently.
Yes
{Empty}
5 - very satisfied