Submission Number: 16579
Submission ID: 67043
Submission UUID: e048af9f-7429-4a1d-af45-427305e0640e

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:58

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Barr Engineering Company
14429
Hydraulic Oversight for Design of I-90 Mississippi
98061
The State contracted with Barr Engineering Company to provide assistance with oversight of the hydraulics design portion of the detail design for the new Interstate 90 (I-90) and US 61/14 approach roadways and interchange on a new Mississippi River bridge crossing. The detail design work included grading, surfacing, bridges, retaining walls, ponds, culverts, storm sewer, and other traffic features. The Contractor provided the State with oversight for the hydraulics design portion of the detail design.
Project Duration
Fri, 01/21/2011 - 00:00
Sat, 01/12/2013 - 00:00
Sat, 01/12/2013 - 00:00
Yes
{Empty}
Contract Amounts
$98065.50
$0.0
$98065.50
Yes
TH
No
{Empty}
Jai Kalsy
jai.kalsy@state.mn.us
Excellent
Excellent
Satisfactory
Exceptional - performed very well and was very responsive
Yes
{Empty}
5 - very satisfied