TRANSPORTATION DEPT
Isthmus Engineering, Inc.
74935
Detailed Design and Final Plans for State Project
5421
This contract provided the engineering products and services required to let and construct State Project 6405-64, resulting in smoother and safer pavements for the traveling public. 2) This contract was needed because current State staff was working at capacity on the State’s typical highway improvement projects. Resources were not available to perform this work in time to meet the scheduled letting and construction.
Project Duration
Mon, 03/10/2014 - 00:00
Fri, 12/26/2014 - 00:00
Fri, 12/26/2014 - 00:00
Yes
{Empty}
Contract Amounts
$85134.10
{Empty}
$85134.10
Yes
TH
No
{Empty}
Matthew Brua
matthew.brua@state.mn.us
The Contractor delivered documents on time
Average Knowledge, Exceptional Product
Initial budget was high, but overall cost was good.
Performance started off poorly (first job for the district, first job as a prime), but the performance increased drastically by the end.
Yes
{Empty}
4 - satisfied