TRANSPORTATION DEPT
Parsons Brinckerhoff
72104
TH 610 Design Build RFP development
98875 W36
The purpose of the contract was for contractor to conduct all work necessary to develop and assemble the best value procurement documents for State Project (SP) 2771-37, Trunk Highway (TH) 610, including the Instructions to Proposers (ITP), the Design Build Request for Proposal (DB RFP) Books 1, 2, 3; Reference Information Documents (RID), and the Design Build Conformed Contract.
Project Duration
Thu, 12/05/2013 - 00:00
Thu, 10/30/2014 - 00:00
Thu, 10/30/2014 - 00:00
Yes
{Empty}
Contract Amounts
$486745.59
{Empty}
$486745.59
Yes
TH
No
{Empty}
Jerome Adams
Jerome.Adams@state.mn.us
Very satisfied as it was on time and met an accelerated schedule.
Satisfied
Satisfied.
Satisfied.--I enjoy working with PB and I would work with them again. Being the Design Build GEC is a high bar. MnDOT expects excellence, innovation, speed, and knowing everything. PB does a good job of getting the right experts to answer questions. Their customer service is excellent and they always respond promptly to requests. The turned in a complicated product that was on an accelerated schedule on time, and that is a big feat. Writing Design Build Contract language is difficult. I think they could have done better with their quality control and rewriting some of the language to be more contractual while being more Design Build Performance Based.
Yes
{Empty}
5 - very satisfied