Submission Number: 16380
Submission ID: 66844
Submission UUID: 1f73457c-3caf-4e58-a44d-695d996cf142

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:58

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
HDR Construction Control Corporation
106647
Construction Oversight for Elk Run Interchange Des
96309
The State contracted with HDR Construction Control Corporation to provide construction oversight for the Elk Run Interchange Design-Build Project on US Highway 52 (US 52) in Pine Island, Minnesota. The Elk Run Interchange Design-Build Project consisted of designing and building simultaneously a new interchange and frontage road system in the City of Pine Island. The construction oversight Contractor’s deliverables included, but are not limited to, Construction Contract Administration, Quality Verification Inspection, Quality Verification Testing, Design and Construction Claims Review, and Post-Construction Claims Review.
Project Duration
Mon, 11/15/2010 - 00:00
Fri, 11/30/2012 - 00:00
Sun, 11/15/2015 - 00:00
No
{Empty}
Contract Amounts
$1826191.08
$399294.92
$2225486.00
No
TH
No
{Empty}
Terry Ward
Terry.ward@state.mn.us
Average
Great
Average
Great
Yes
{Empty}
4 - satisfied