TRANSPORTATION DEPT
HDR Engineering, Inc.
71591
SP 2710-2440B 3rd Ave Bridge Scour
04485W01
This contract was to prepare a plan to repair bridge foundation scour of the TH 65 bridge over the Mississippi River. The contractor was retained for their expertise in development of this type of project and the necessary plans.
Project Duration
Tue, 11/19/2013 - 00:00
Tue, 06/30/2015 - 00:00
Tue, 06/30/2015 - 00:00
Yes
{Empty}
Contract Amounts
$286875.35
$44627.41
$331502.76
Yes
TH
No
{Empty}
Ron Rauchle
Ron.rauchle@state.mn.us
The contractor completed the assigned work on time
The contractor’s quality was adequate except as noted below in COMMENT section
The contractor’s cost was reasonable considering the nature of this project
MnDOT was satisfied with the overall consultant service from HDR
Yes
{Empty}
4 - satisfied