TRANSPORTATION DEPT
Stonebrooke Engineering, Inc.
76373
Revisions to Bridge Design Manual Chapter 8
5551
To revise Chapter 8 - wood Structures of the State Load Resistance Factor Design (LRFD) Bridge Design Manual to meet current American Association of State Highway and Transportation Officials (AASHTO) Load Resistance Factor Design (LRFD) Bridge Design Specifications, AASHTO Manual for Bridge Evaluation, provide additional design and load rating guidance not currently in Chapter 8, present State policy on various factors application, materials use (including treatments}, structure types, and design, and to illustrate timber bridge designs and load ratings with multiple examples.
Project Duration
Fri, 04/04/2014 - 00:00
Wed, 12/31/2014 - 00:00
Thu, 12/31/2015 - 00:00
Yes
{Empty}
Contract Amounts
$40722.86
$9999.10
$50721.96
No
STATE AID
Yes
Under the recommendation of the County Engineers Bridge Committee, and recognition of Ron Benson’s extensive experience with designing, and load rating local timber bridges statewide, he was selected to perform this work.
Don Conkel
Dave.conkel@state.mn.us
Average
Above Average
Above Average
Above Average
Yes
Not necessarily a negative action, but Project Manager Ron Benson switched firms during the contract. He left Stantec for Stonebrooke Engineering, Inc. This created some unforeseen contract delays and time extensions. However, Ron’s reputation and mastery of local timber bridge structures was well worth altering the contract to allow Ron to complete the manual update, and under his direction at Stonebrooke.
5 - very satisfied