TRANSPORTATION DEPT
Visu-Sewer, Inc
93316
TH 169 Video Inspections
1000064
Inspection, location, digital video documentation and cleaning if necessary of obstructed or dirty storm sewer system along TH 169 from TH 62 to TH 55 in the Metro area.
Project Duration
Tue, 05/19/2015 - 00:00
Fri, 02/26/2016 - 00:00
Thu, 12/31/2015 - 00:00
Yes
{Empty}
Contract Amounts
$194252.00
$0
$194252.00
Yes
TH
No
{Empty}
Lee Daleiden
Lee.Daleiden@state.mn.us
Visu Sewer got started in late May of 2016 and worked throughout the summer / fall to complete the project. There were a couple of weeks when Visu Sewer pulled themselves off the project to work on other non-related projects(s) but I don’t believe that it hampered the completion of this project.
The quality of the deliverables; videos, edited maps and hydinfra upload was excellent. At several locations existing or new features were collected but the networking was not reflective of the edit map pages. A few locations new features were identified on the edit maps but GPS positions and inspection information was not provided. If Visu Sewer cannot televise something due to access issues then they should draw the information on the edited maps and (in combination with SEH) collect GPS information and conduct an inspection with a Rating = 0
Great – they stayed within budget and cleaned some of the infrastructure. I feel that the project estimate and expenditures were right on for this video inspection and cleaning project.
Overall this was a very difficult project with lots of traffic control issues and difficult access to much of the infrastructure. Visu Sewer did an excellent job throughout the project accessing the infrastructure and making changes and additions to the storm sewer network. The networking changes and inspections of features not accessible (structures) was sloppy at times and should be corrected for any future inspection project.
Yes
{Empty}
5 - very satisfied