TRANSPORTATION DEPT
Short Elliott Hendrickson, Inc.
21648
T.H. 169 / I-494 Design-Build Project Construction
96976
To provided Construction Engineering, Inspection Verification and Design Review Oversight of the 169/494 Interchange Design Build construction contract. A consultant contract was necessary as MnDOT did not have sufficient in-house resources to staff all needs for this project due to total project workload in the Metro.
Project Duration
Wed, 11/10/2010 - 00:00
Wed, 12/31/2014 - 00:00
Tue, 11/10/2015 - 00:00
Yes
28987
Contract Amounts
$5608296.44
$-92.38
$5608204.06
Yes
BOND AND FEDERAL
No
{Empty}
Michael Beer
michael.beer@state.mn.us
Consultant Contract response to needs and issues was timely. The separate DB construction contract has taken longer and controlled the timeline for this consultant contract, including the time extension amendments
Consultant Contract Quality was good and as expected.
Cost came in under budget even with time extensions. Consultant did a good job of managing the work needs on this contract and assigning other consultant work to staff in down times
Good. Performed all tasks as needed. Adjusted staff and resources as needed/requested. Offered additional support services when the need arose.
Yes
NONE
4 - satisfied