TRANSPORTATION DEPT
Short Elliott Hendrickson, Inc. (SEH)
61176
Implementation of LED Roadway Lighting
755
This proposed implementation project will evaluate the use of LED lighting luminaires for use in Mn/DOT roadway lighting. The project will install new LED roadway lighting luminaires along a segment of highway replacing existing high pressure sodium (HPS) luminaires. The project will also replace adjacent existing HPS luminaires with new ones for a fair comparison. For the LED section and the HPS section electrical power usage will be measured on the circuit(s) and light levels will be measured. A cost comparison of the LED and HPS luminaires will be documented. Maintenance issues will be documented.
Project Duration
Thu, 05/02/2013 - 00:00
Tue, 06/30/2015 - 00:00
Sat, 04/30/2016 - 00:00
Yes
{Empty}
Contract Amounts
$32872.00
$0
$28348.68
Yes
TH, FEDERAL
No
{Empty}
Deb Fick
deb.fick@state.mn.us
GOOD
GOOD
GOOD
Contractor performed well. There were issues beyond the contractors control that added difficulty to evaluating the lighting systems (there was a cable hit that took lights out and MnDOT was not able to complete light level runs in the area due to equipment issues).
Yes
{Empty}
4 - satisfied