Submission Number: 15787
Submission ID: 66251
Submission UUID: eb1a4651-39e6-42d5-835d-b1987579e6a9

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:56

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
URS Corporation
65284
Limited Phase I Environmental Site Assessment Upda
3995
State plans to reconstruct I-494 from I-394 to I-94 through the cities of Minnetonka, Plymouth, and Maple Grove. The proposed reconstruction includes concrete pavement repair, unbonded concrete overlay, should widening for dynamic shoulder, re-decking and widening of bridges, noise walls, drainage (ponds), and traffic signals. A Phase I Environmental Site Assessment was completed in 2005 for the majority of the project corridor. The purpose of this contract is to complete a limited Phase I Environmental Site Assessment and Drilling Investigation based on the results of the Phase I of any suspect areas in the current project area. This information will be used by State to determine final project design plans/specifications and to obtain liability protections, if required.
Project Duration
Tue, 07/16/2013 - 00:00
Tue, 09/30/2014 - 00:00
Fri, 09/12/2014 - 00:00
Yes
{Empty}
Contract Amounts
$90696.76
$7274.38
$97971.14
Yes
TH/BOND
No
{Empty}
Keri Aufdencamp
Keri.aufdencamp@state.mn.us
Great
Great
Acceptable
Great
Yes
{Empty}
4 - satisfied