TRANSPORTATION DEPT
SRF Consulting Group, Inc.
36989
Environmental Documentation and Preliminary Desi
98151
State is in need of Traffic Analysis, Preliminary Design and Environmental Documentation for the Highway 169 Corridor from the Highway 101/10 interchange in Elk River to Zimmerman, and Highway 10 from the Highway 169/101 Interchange to Orono Lake in Elk River.
Project Duration
Mon, 01/24/2011 - 00:00
Tue, 01/01/2013 - 00:00
Fri, 01/31/2014 - 00:00
No
{Empty}
Contract Amounts
$94802.00
$0
$75837.73
Yes
TH
No
{Empty}
Jim Hallgren
James.hallgren@state.mn.us
Overall the contractor’s timeliness was very good. There was some review issues that caused an overall delay that were outside the contractor’s control.
The contractor’s quality was very good.
The contractor did a good job to keep the project within budget.
The contractor’s performance was exceptional.
Yes
NONE
5 - very satisfied