Natural Resources Dept
U.S. Army Corps of Engineers
3000028975
Lock and Dam 1 Fish Barrier Evaluation and Review
{Empty}
Funds were provided to the US Army Corps of Engineers to expedite evaluation of MN DNR's proposed major modifications, electric fish barrier, to Lock and Dam 1 on the Upper Mississippi River in accordance with 33 U.S.C. 408 (Section 408). The electric fish barrier was deemed high priority due to the threat of invasive carp to northern MN's aquatic resources. Beginning construction as soon as possible was deemed crucial for success of the project.
Project Duration
Mon, 10/22/2012 - 00:00
Mon, 06/30/2014 - 00:00
Mon, 06/30/2014 - 00:00
Yes
{Empty}
Contract Amounts
$111000
$0
$111000
Yes
General and Invasive Species
Yes
This contract was set up to expedite the evaluation of DNR proposed major modifications to Lock and Dam 1 on the Mississippi River for a Section 408 permit which could only be issued by the US Army Corps of Engineers.
Nick Frohnauer
Nick.Frohnauer@state.mn.us
The contractor worked with the DNR throughout the design phase, completing the necessary steps in the permitting process.
Contractor was a full participant in the design and permitting phase of the Lock and Dam 1 electric barrier project. Resulting products met all necessary standards.
The contractor submitted a reasonable estimate of costs, stayed within budget, and refunded unexpended funds.
Contractor was engaged throughout the project. Contractor met expectations as outlined in the contract. I would rate this as a positive experience.
Yes
{Empty}
4 - satisfied