Administration Dept
BWBR Architects Inc
84443
Design for Mitigate Industry Flooding
78FA0036
Design to fix Industry building flooding. Industry building and parking lot flooded two times due to heavy rains.
Project Duration
Sun, 01/19/2014 - 00:00
Fri, 10/09/2015 - 00:00
Fri, 07/17/2015 - 00:00
Yes
{Empty}
Contract Amounts
$50000.00
$0.00
$50000.00
Yes
Agency
Yes
This was an emergency situation. BWBR had knowledge of the facility and building having done design work at the MCF Faribault previously and was readily available to design a fix.
Gary A. Krocak
gary.krocak@state.mn.us
Prompt. Able to meet schedule needs.
Good quality documents and oversight.
Fair for 'emergency' situation.
No issues. Met facility needs and contract requirements.
Yes
{Empty}
4 - satisfied