Corrections Dept
BKBM Engineers
94982
Study for Tunnel Repair - Civil & Structural
78ML0059
Emergency study required to determine cause of corrosion to MCF main electrical feeders located in a subtunnel. This portion of the work required on site structural inspection for safety, soil borings, utility locates and drainage analysis to help determine interim and final fix.
Project Duration
Thu, 06/25/2015 - 00:00
Wed, 08/05/2015 - 00:00
Wed, 08/05/2015 - 00:00
Yes
{Empty}
Contract Amounts
$30000.00
$0.00
$30000.00
Yes
CAPRA
Yes
Emergency. They were recommended by consultant who was on site.
Glen Heino
glen.heino@state.mn.us
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Yes
n/a
4 - satisfied