Submission Number: 15372
Submission ID: 65836
Submission UUID: 4e191f81-9872-4bd2-a900-15b17da0e634

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:56

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
LHB Inc.
52530/30000199326
London Road Drainage Repair
2052
This contract was for the evaluation of historic bridge stone arch culverts under T.H. 61 after they were damaged with the June 2012 flood. After the culverts were evaluated for damage, contract was amended to prepare plans for repair. These plans required close coordination with the State Historical Preservation Office (SHPO).
Project Duration
Tue, 09/04/2012 - 00:00
Wed, 03/13/2013 - 00:00
Sun, 08/31/2014 - 00:00
Yes
1858.00
Contract Amounts
$21180.00
$144278.00
$154544.88
Yes
Emergency Relief
No
{Empty}
Dave Mohar
david.mohar@state.mn.us
Above average
Above average
average
Above average
Yes
{Empty}
5 - very satisfied